ISBAS PROJE YÖNETIMI is within the borders of ISTANBUL city, ÇATALCA district, FERHATPASA SB. It is at 41.12737100 latitude and 28.47857500 longitude. It has been assigned the category of SANAYI. It is near CEREN SITESI SOKAK.

Leave a Comment